Lights, Fridge, Action

Electric is done and the lights are in!

There are under-cabinet lights too, which I apparently forgot to turn on for this photo.

We finally bought a fridge! They can’t deliver it until the 24th, so we are postponing moving a bit since summer without a fridge sounds less ideal.

We settled on a 33-inch French door by LG, with a water dispenser (a big point of indecision).

A few other exciting appliance-related things have also been happening: First, the dishwasher is all hooked up and leveled.

Ahem. Not leveled in this picture. But it is now, in real life, promise.

The stove and microwave were delivered, and Alex did a lot of research around how to best cut a hole in the wall (through aluminum siding!) in order to vent the range outdoors, which will be a welcome upgrade for us. He finished installing the vent today; tomorrow we will mount the microwave properly and hook up the stove.

And finally, not related to appliances, the dining room and living room floors got refinished! And countertops are scheduled to be installed July 16th! And Sara is rushing to finally, actually paint all the things and stop changing her mind about living room colors. Things are coming together!

Newly refinished red oak floors! This is the living room but the dining room is the same.